LiDAR Topographic Surveying | Cebu | 2026
LiDAR topographic survey of a 23-hectare lot, flown at 90 m with terrain follow in April 2026 and georeferenced with RTK / PPK (2 cm horizontal, ±3 cm vertical accuracy).
Deliverables included a 2 cm/px orthomosaic and a topographic map covering terrain from about 78 m to 195 m in elevation.
Full thermographic inspection of a 350 MWp solar farm in Nueva Ecija for the MTerra project, flown at 120 m in May 2026 with RGB and thermal sensors and georeferenced with RTK / PPK (2 cm horizontal, ±3 cm vertical accuracy).
View project →
LiDAR topographic survey of a mineable site, flown in March 2026 with RGB and LiDAR sensors and georeferenced with RTK, PPK and ground control points (2 cm horizontal, ±3 cm vertical accuracy).
View project →
LiDAR topographic survey along 10 kilometers of the 230 kV transmission line for the Malita Solar Power Plant, flown at 100 m in June 2026 and georeferenced with ground control points (2 cm horizontal, ±3 cm vertical accuracy).
View project →