Portfolio  /  Malita Solar Power Plant 230 kV Transmission Line

Malita Solar Power Plant 230 kV Transmission Line

LiDAR Topographic Surveying | Malita, Davao del Sur | 2026

About this project

LiDAR topographic survey along 10 kilometers of the 230 kV transmission line for the Malita Solar Power Plant, flown at 100 m in June 2026 and georeferenced with ground control points (2 cm horizontal, ±3 cm vertical accuracy).

Deliverables covered the full corridor: a 3 cm/px RGB orthomosaic and a LiDAR elevation model at 5 cm resolution.

Photos