LiDAR Topographic Surveying | Languyan, Tawi-Tawi | 2026
LiDAR topographic survey of a mineable site, flown in March 2026 with RGB and LiDAR sensors and georeferenced with RTK, PPK and ground control points (2 cm horizontal, ±3 cm vertical accuracy).
Deliverables for the tenement included a digital elevation model, a 5 cm/px orthomosaic and a contour map.
Full thermographic inspection of a 350 MWp solar farm in Nueva Ecija for the MTerra project, flown at 120 m in May 2026 with RGB and thermal sensors and georeferenced with RTK / PPK (2 cm horizontal, ±3 cm vertical accuracy).
View project →
LiDAR topographic survey along 10 kilometers of the 230 kV transmission line for the Malita Solar Power Plant, flown at 100 m in June 2026 and georeferenced with ground control points (2 cm horizontal, ±3 cm vertical accuracy).
View project →
Drone facade inspection of a multi-storey building, flown in August 2026.
View project →