Building Inspection | 2026
Drone facade inspection of a multi-storey building, flown in August 2026.
The imagery was processed into a detailed 3D model in which every defect found was tagged and numbered, more than 370 in all, so the client's engineers could locate, review and plan repairs for each one.
Full thermographic inspection of a 350 MWp solar farm in Nueva Ecija for the MTerra project, flown at 120 m in May 2026 with RGB and thermal sensors and georeferenced with RTK / PPK (2 cm horizontal, ±3 cm vertical accuracy).
View project →
LiDAR topographic survey of a mineable site, flown in March 2026 with RGB and LiDAR sensors and georeferenced with RTK, PPK and ground control points (2 cm horizontal, ±3 cm vertical accuracy).
View project →
LiDAR topographic survey along 10 kilometers of the 230 kV transmission line for the Malita Solar Power Plant, flown at 100 m in June 2026 and georeferenced with ground control points (2 cm horizontal, ±3 cm vertical accuracy).
View project →